Dundonnell Wind Farm
37°52′S 142°58′E / 37.867°S 142.967°E / -37.867; 142.967
Dundonnell Wind Farm is at Dundonnell, 23 kilometres (14 mi) northeast of Mortlake in the Australian state of Victoria. Construction began in January 2019 and was completed in 2020 with 80 Vestas wind turbines with a capacity to generate 336MW of electricity.[1] The drive trains and hubs were assembled at the former Ford Australia site in Geelong.[2]
The wind farm has contracts to supply 37% of its output to the government of Victoria and 50% to Snowy Hydro. It is being developed by Tilt Renewables.[3] The wind farm connects to the grid via 38 kilometres of 220kV overhead transmission line to a substation near the Mortlake Power Station.[4]
A 327 tonne transformer transported at night took four nights to reach Dundonnell from Glen Waverley in eastern Melbourne in August 2019.[5] It was manufactured there by the Wilson Transformer Company.[6] The developer spent $80 million to connect the wind farm to the main 500 kV grid via a 38 km 220 kV Ausnet line, avoiding the connection problems many other generating stations have in the interior.[7] Full commissioning was delayed in mid-2020 due to concerns of the Australian Energy Market Operator (AEMO), despite it being commissioned according to a plan negotiated with AEMO in 2018.[8]
References
- ^ "Vestas wins largest project in Victoria's Renewable Energy Auction with the first V150-4.2MW turbines in Australia". 14 November 2018. Archived from the original on 19 October 2021. Retrieved 19 October 2021.
- ^ Vorrath, Sophie (26 September 2019). "Vestas wind turbine assembly plant opens at old Ford factory in Victoria". Renew Economy. Retrieved 30 September 2019.
- ^ Vorrath, Sophie (18 January 2019). "Construction begins on 336MW Dundonnell wind farm – one of biggest in Victoria". Renew Economy. Retrieved 30 September 2019.
- ^ Himmelreich, Everard (17 January 2019). "Work begins on 80-turbine Dundonnell wind farm". The Standard. Australian Community Media. Retrieved 30 September 2019.
- ^ Beers, Lucy Mae (12 August 2019). "Superload to hit the road and cause traffic delays across Melbourne". 7NEWS. Retrieved 7 November 2019.
- ^ Cowan, Geordie (8 August 2019). "Superload made in Glen Waverley by Wilson Transformer Company hits the road". Herald Sun. Retrieved 7 November 2019.
- ^ Parkinson, Giles (17 March 2020). "Huge Dundonnell wind farm begins production in Victoria". RenewEconomy.
- ^ Vorrath, Sophie (13 July 2020). "Huge Dundonnell wind farm hit by "unanticipated" commissioning delays". Renew Economy. Retrieved 11 August 2020.
- v
- t
- e
(List)
- Ararat
- Bald Hills
- Bulgana
- Challicum Hills
- Chepstowe
- Codrington
- Coonooer Bridge
- Crowlands
- Dundonnell
- Hepburn
- Kiata
- Lal Lal (Yendon)
- Leonards Hill
- Macarthur
- Maroona
- Mortons Lane
- Mount Gellibrand
- Mount Mercer
- Murra Warra
- Oaklands Hill
- Portland
- Salt Creek
- Toora
- Waubra
- Wonthaggi
- Yambuk
- Yaloak South
- Proposed: Mildura
- Bendigo
- Shepparton
- Symex Cogeneration Project
- Victoria Harbour Cogeneration Project
- Portland Geothermal Facility
Inner Melbourne |
|
---|---|
Western Suburbs, Western Victoria | |
Eastern/Northeastern Suburbs, Eastern Victoria | |
Northwestern Suburbs | |
Southeastern Suburbs, Mornington Peninsula |
- AGL Energy
- Alinta Energy
- Australian Power and Gas
- Click Energy
- Country Energy
- Dodo Power & Gas
- EnergyAustralia
- Lumo Energy
- Momentum Energy
- Neighbourhood Energy
- Origin Energy
- Powerdirect
- Powershop
- Red Energy
- Simply Energy
- Pacific Hydro
- Solar Systems
- Essential Services Commission
- Australian Energy Market Operator
- Australian Energy Market Commission
- Australian Energy Regulator
- Energy Safe Victoria
- Decommissioned power stations
- Defunct utility companies
- State Electricity Commission
- Gas and Fuel Corporation
- Victorian Power Exchange
- NEMMCO
- VENCorp
This Victoria (state) article is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e